Key Project Personnel:

City of Aiken
Engineer: John Poole

245 Dupont Drive NW
Aiken, SC 29801
803-642-7610
jpoole@cityofaikensc.gov

City of Aiken
On-Site Inspector: Joe Yates

245 Dupont Drive NW
Aiken, SC 29801
803-642-7610
jyates@cityofaikensc.gov

Alfred Benesch & Co
Engineer:
Oliver Weston
1005 Broad Street, Ste. 200
Augusta, GA 30901
706-722-4114
oweston@benesch.com

Alfred Benesch & Co
On-Site Inspector: Chris Grimes
1005 Broad Street, Ste. 200
Augusta, GA 30901
706-722-4114
cgrimes@benesch.com

First Construction Management
Contact: Roger Holcombe
1003 E. Recess Road
Hanahan, SC 29410
843-647-7434 x 1
Roger@1stmgmt.org

The City of Aiken has contracted with First Construction Management to install approximately 1 mile of sidewalk along the north side of Hampton Avenue. When construction is complete, the sidewalk will begin at the Dollar General on Hampton Avenue and will continue east to Greenville Avenue. The proposed sidewalk locations have been recommended by SCDOT to promote pedestrian safety while walking alongside the roadway.

The sidewalk is proposed to be constructed entirely within the existing SCDOT right-of-way and no sidewalk construction is planned on private property as part of this project. The completion date is currently set for October 1, 2020 but this will be updated as required.

The project will be constructed by First Construction Management with inspection services being performed by the City of Aiken Engineering staff and Alfred Benesch & Company.

Project Progress

June 18

800 Block Hampton Ave Still In Progress.

June 18

1100 Block Hampton Ave Completed.

June 18

1200 Block Hampton Ave Completed.

June 18

Dollar General to Tennessee Hampton Ave Completed.