Stormwater Management

245 Dupont Dr. NW • Aiken, SC 29801 • 803-642-7715

City of Aiken Stormwater Construction Permitting / Design

Prepare to submit one set of plans and corresponding Notice of Intent (NOI) and appropriate documentation to the City of Aiken Planning Department. It typically takes upwards of 10 business days to receive comments/revisions. Once all comments are satisfactorily addressed, the plan is approved. An approval letter will be provided to the applicant and if over 1 acre is disturbed or part of a larger common plan, the next step is to receive NPDES coverage. The approval letter, copy of the NOI, and appropriate SCDHEC fees shall be submitted to SCDHEC directly by the applicant. Please provide the City Engineering and Utilities Department with notification and a copy of NPDES coverage once received. Once all applicable City permitting has been approved (Notice to Construct, building permit, etc.) a pre-construction meeting can be scheduled with City staff present. The pre-construction meeting will not all go over agendas and timelines but this is when you also will receive your grading permit and final stamped plans.

Notice of Intent/Fees: NOI – Individual Lot / NOI – Less than 1 acre / NOI – Greater than 1 acre or LCP

Notice of Termination: NOT Form

Residential Application: Stormwater Residential EPSC Application

MS4/General Permit: MS4-NPDES\012014_SMS4_Permit SCR030000 / Construction Site SW Control-CGP-permit

SWPPP Template: SWPPP-CGP-template

BMP Manual: City of Aiken Stormwater Design Manual

BMP Manual Checklist: Appendix E – Designer Checklist

BMP Manual Design Spreadsheet: Stormwater Design Spreadsheet

Maintenance Agreements : O&M for Private PC BMPs

Construction Inspection Form: Construction Inspection Form

Enforcement Response Procedure: Construction enforcement response plan flowchart

Contractor Certification Form: SCDHEC Contractor Certification Form

Transfer of Ownership Form: Transfer of Ownership Form

Major Modification Form: Major Modification Form

Stormwater Standard Details: Stormwater Standard Details

Stormwater Temporary Silt Fence Detail: Stormwater Temporary Silt Fence Detail

BMP Design Manual Outreach Session

ADSI Traning Presentation: PDF PresentationVideo Presentation